Documents
Brandon Road specifications, the Design Tech Sub, and the MSI device validation reports.
Design Tech Sub
BMSI’s design technical submission — converged MSI scope across both buildings. Issued for client approval.
MSI device validation reports
Per-building validation summary — device and point counts, Online / Details / Named tallies by sub-system, and sign-off block. Generated from a live read of the canonical Airtable.