Witnessing & Handover

Formal witnessing sessions, completion tracking, and handover package preparation

MSI Site SAT Window
01 Jun 202619 Jun 2026
15 days · PC: 22 Jun 2026
36days

Handover Readiness

0%
Ready
FAT Complete0/105 (0%)
SAT Complete0/105 (0%)
CBN Onboarded0/105 (0%)
Points Verified0/1542 (0%)
FAT Witnessed
0 / 12
10% minimum required
SAT Witnessed
0 / 105
All devices required
CBN Onboarded
0 / 105
Network integration
Docs Ready
2 / 10
Handover documents

MSI Witnessing Requirements

FAT Witnessing

  • Client representative must witness 10% minimum of FAT tests
  • All critical devices require witnessed FAT
  • Photo/video documentation required
  • Sign-off sheet must be completed

SAT Witnessing

  • All sub-systems require witnessed SAT
  • Integration testing with live building services
  • Snagging list generation and tracking
  • Client sign-off before handover progression

Sub-System Status

Sub-SystemDevicesFATSATCBNStatus
BMS
60/60/60/6Not Started
Metering
970/970/970/97Not Started
Security
20/20/20/2Not Started

Handover Documentation

Device Information Register (DIR)Required
Complete
Points RegisterRequired
Complete
!
FAT CertificatesRequired
Partial
SAT CertificatesRequired
Pending
Network DiagramsRequired
Pending
Security Audit ReportRequired
Pending
O&M ManualsRequired
Pending
Training Records
Pending
As-Built DrawingsRequired
Pending
Warranty DocumentsRequired
Pending

Export Handover Package

Full DIR Export

Complete Device Information Register with all fields and status

Click to generate →
Points Register

Complete points list with nomenclature and verification status

Click to generate →
Complete Package

Full handover package with DIR, points, and certificates

Click to generate →