Factory Acceptance Testing

Pre-delivery testing at manufacturer/integrator facility

← Back to Testing

Overall Progress

0/105 devices
Device-level connectivity testing0%

FAT by Sub-System

FAT Testing Scope (per MSI Specification)

  • Device connectivity verification
  • Protocol communication established
  • Telemetry data flowing
  • Security hardening verified